Project
PADUA COLLEGE
Location
Victoria, Australia
Architects
Baldasso cortese
The construction project for this centre began in 2022 and is expected to be completed by the end of 2023. This timeline not only demonstrates the dedication to precision and quality construction, but also the long-term vision for this space, designed to enrich the education and student experience.
The choice of our Rustikotta Classic ceramic façade underlines the importance of aesthetics, durability and quality in this project. Rustikotta Classic is known for its exceptional appearance, its ability to stand the test of time and its versatility to adapt to cutting-edge architectural designs. Its great detailing and texture visually and tactilely enhance the structure, making it an inspirational focal point.
RUSTIKOTTA CLASSIC